101 Moorgate, London

A steel frame commercial development situated in the heart of London.

​

DCD Ltd installed 8,364m² of metal decking, provided safety netting, and welded more than 39,500 19x95 (LAW) shear connectors as part of the works.


Delivered on a fast-track programme, the project required careful planning and close coordination with the steel contractor to ensure safe and efficient installation in a central London location.